Sunday 21st November 2010

The site looks a lot neater so it looks like they're going to be doing all the brickwork before the holiday break.

Today I noticed that they have delivered some cement and equipment for the bricklaying, which they have stored in the little makeshift metal shed.

The large hole at the front of the block has been covered up and levelled.

No comments:

Post a Comment